PostgreSQL 7.4 Documentation | ||||
---|---|---|---|---|
Prev | Fast Backward | Fast Forward | Next |
The regression tests are a comprehensive set of tests for the SQL implementation in PostgreSQL. They test standard SQL operations as well as the extended capabilities of PostgreSQL. From PostgreSQL 6.1 onward, the regression tests are current for every official release.
The regression test can be run against an already installed and running server, or using a temporary installation within the build tree. Furthermore, there is a "parallel" and a "sequential" mode for running the tests. The sequential method runs each test script in turn, whereas the parallel method starts up multiple server processes to run groups of tests in parallel. Parallel testing gives confidence that interprocess communication and locking are working correctly. For historical reasons, the sequential test is usually run against an existing installation and the parallel method against a temporary installation, but there are no technical reasons for this.
To run the regression tests after building but before installation, type
gmake check
in the top-level directory. (Or you can change to src/test/regress and run the command there.) This will first build several auxiliary files, such as some sample user-defined trigger functions, and then run the test driver script. At the end you should see something like
====================== All 93 tests passed. ======================
or otherwise a note about which tests failed. See Section 26.2 below for more.
Because this test method runs a temporary server, it will not work when you are the root user (since the server will not start as root). If you already did the build as root, you do not have to start all over. Instead, make the regression test directory writable by some other user, log in as that user, and restart the tests. For example
root# chmod -R a+w src/test/regress root# chmod -R a+w contrib/spi root# su - joeuser joeuser$ cd top-level build directory joeuser$ gmake check
(The only possible "security risk" here is that other users might be able to alter the regression test results behind your back. Use common sense when managing user permissions.)
Alternatively, run the tests after installation.
The parallel regression test starts quite a few processes under your user ID. Presently, the maximum concurrency is twenty parallel test scripts, which means sixty processes: there's a server process, a psql, and usually a shell parent process for the psql for each test script. So if your system enforces a per-user limit on the number of processes, make sure this limit is at least seventy-five or so, else you may get random-seeming failures in the parallel test. If you are not in a position to raise the limit, you can cut down the degree of parallelism by setting the MAX_CONNECTIONS parameter. For example,
gmake MAX_CONNECTIONS=10 check
runs no more than ten tests concurrently.
On some systems, the default Bourne-compatible shell (/bin/sh) gets confused when it has to manage too many child processes in parallel. This may cause the parallel test run to lock up or fail. In such cases, specify a different Bourne-compatible shell on the command line, for example:
gmake SHELL=/bin/ksh check
If no non-broken shell is available, you may be able to work around the problem by limiting the number of connections, as shown above.
To run the tests after installation (see Chapter 14), initialize a data area and start the server, as explained in Chapter 16, then type
gmake installcheck
The tests will expect to contact the server at the local host and the default port number, unless directed otherwise by PGHOST and PGPORT environment variables.